Gosh..it is really over a month ?
Bathroom tiling finished..I used Gripfill in the end. Half of it is grouted to enable the bath to be fitted..so bathroom now has bath, bog and washbasin. Pictures to follow. Still a fair bit to go.
That's the trouble...too many contingencies.
Central heating now on a non-vented system but as predicted there is a leak somewhere as I have to keep topping up the system a little every few days. Low priority.
Had a lovely lass in to paint three rooms upstairs...took her just two days. Feels like we might be getting somewhere. Thanks to Lons from UKW I've got a good lead man lined up for the orangerie..which will be a separate thread.
Getting the garage/workshop sorted as per t'other thread. And then....
And then yesterday the oak floorboards arrived. 220 sq m. 2.3 tons. Shifted off the lorry by me and the driver..I gave him a good tip...took us two hours. This is what 220 sq m of oak flooring looks like...
The photos don't do the volume justice.
It doesn't look much but, believe me, it does in the flesh.
If opportunity doesn't knock, build a door.