Mike G wrote:Have you got permanent access to that right angle, Malcolm?
I wondered who'd spot that!
You can probably see that the top of the pipework is not that far below the ground level.
Phase 2 of the build will be a deck coming out from the doors with a roof over. The width doesn't quite go to the corner of the building. So the pipe from the gulley and the bend will be outside the deck. The gulley is roddable. The bend going down into the soakaway will be below the deck, but not far below ground level. I will build a trap door into deck to access that bend.