Thanks Doug I would have it cut by a local engineering shop. I would still have 3m of track just in a more user friendly format.
My workshop is quite small if I put a 1.5m track on the bench to make a cross cut it would over hang the bench by 750mm leaving me 250mm to get past. Where a 1m track would still allow me to make crosscuts and have space to move around. If I needed I could still join them all together.
Anyway I used the saw today to finish off my mammoth fencing project it works perfectly. It sailed over the joint when I trimmed the chip strip. It was so easy to push compared to the Titan with very little vibration and such a smooth cut.
I know it was three times the price but it is way better and I intend to get my money’s worth I will be looking for stuff to cut