Well managed to get onto the rebuild now that the wind has dropped and the rain stopped.
At least today managed to make a start on the biggest panel.
Layed out the frame and screwed together squared it up and held it with a diagonal brace while I got most of the feather edge on. Brace removed and the rest of the feather edge completed.
I was going to spray all the parts but decided to spray panels as they are finished. This one will need to dry before spraying but at least it is finished as far as construction is concerned. I will be putting three or four blocks on the bottom for when we move it as the feather board protrudes 1/2" below the bottom frame. Not worried about the feather board colours as the finish will bring it all to the same colour.
The next piece will be the solid end and then the two doors before constructing the other end I need a door to double-check my measurements as this is being made as I go and not to a plan. I know the sizes without a drawing.
- (332.04 KiB)
- (282.1 KiB)
A picture of the roof before the rebuild when I initially built this store I was very much a novice and looking back should have put more supports in the roof.
- (244.63 KiB)