• Hi all and welcome to TheWoodHaven2 brought into the 21st Century, kicking and screaming! We all have Alasdair to thank for the vast bulk of the heavy lifting to get us here, no more so than me because he's taken away a huge burden of responsibility from my shoulders and brought us to this new shiny home, with all your previous content (hopefully) still intact! Please peruse and feed back. There is still plenty to do, like changing the colour scheme, adding the banner graphic, tweaking the odd setting here and there so I have added a new thread in the 'Technical Issues, Bugs and Feature Requests' forum for you to add any issues you find, any missing settings or just anything you'd like to see added/removed from the feature set that Xenforo offers. We will get to everything over the coming weeks so please be patient, but add anything at all to the thread I mention above and we promise to get to them over the next few days/weeks/months. In the meantime, please enjoy!

Chimney top

chataigner

Old Oak
Joined
Jul 23, 2014
Messages
1,127
Reaction score
55
Location
Périgord-Limousin National Park, SW France
The chimney on our "cuisine d'été" converted to BBQ is in poor condition, the whole thing is a bit p****d and the top few courses were just held in place by gravity. So, this week I reset the top few courses and added a cover to stop the rain falling on the BBQ below.

Because it was so p****d I tried to straighten things a bit by tapering the mortar - I'm a rotten bricklayer at the best of times, but this was really tricky, especially as, working from the top, there was no real access to the front except by leaning out over the 5m drop !

The top was made by casting a concrete slab 80 x 60 x 4cm thick with a reinforcing mesh. Made a mould in chipboard, lined it with alli foil, positioned the mesh on wire legs, poured the concrete then vibrated it like mad with the help of an SDS drill. Found that sheer friction stopped the mould from moving much when vibrated, so put some dowel rollers under it - much better.

Yesterday I put the top on. It is surprisingly difficult to lift 48kg (calculated based on density of 2.4) above your head when balanced on a narrow wall above a 5m drop, then place it cleanly and squarely on four spacer bricks without knocking them over. I ended up putting some offcuts of joists across the top of the chimney between the spacer bricks, dumping the 48kg top on them, then used wedges to raise, centre and level it and finally packed fairly dry mortar into the gap between the top and the bricks. I'm sure a professional could do a lot better, but it's up there and its solid ! :D :D

My back on the other hand does not feel too good this morning... :(

cour%20arriere003_1.jpg


cour%20arriere004_1.jpg


Hope to find a way to get easier access to tidy up the pointing.
 
That sounds like a whole bundle of fun!

Just a quickie.....Are all the supporting bricks under the slab oriented the same way? If so, they may be a little vulnerable. Could you add a half-brick at right angles in each corner? That would make me a little less worried in the next high wind.
 
Mike G":1ehecujv said:
That sounds like a whole bundle of fun!

Just a quickie.....Are all the supporting bricks under the slab oriented the same way? If so, they may be a little vulnerable. Could you add a half-brick at right angles in each corner? That would make me a little less worried in the next high wind.

Mmmm... good point Mike, I'll do that.
 