I just bought a dust extractor for my workshop but I have no knowledge of the best way to do the pipe work for my machines.
The extractor has two 100mm inlet pipes one has an end cap so I have attached my first bit of pipework to the other inlet, I am using 110mm sewage pipes for the main trunking running up to the roof and the full length of the workshop (about 7 meters in length).
My question to the experts is what is the best size pipe to run from the main trunk to my machines, I was thinking of reducing to 50mm waste pipes would this work or would it be better to run 110mm to each machine?
The extractor has a 250mm impeller moving 1490cfm
Thanks
The extractor has two 100mm inlet pipes one has an end cap so I have attached my first bit of pipework to the other inlet, I am using 110mm sewage pipes for the main trunking running up to the roof and the full length of the workshop (about 7 meters in length).
My question to the experts is what is the best size pipe to run from the main trunk to my machines, I was thinking of reducing to 50mm waste pipes would this work or would it be better to run 110mm to each machine?
The extractor has a 250mm impeller moving 1490cfm
Thanks