Hi all
I'm not sure if anyone remembers but I came here to ask for advice on my workshop on a slope. I had the ground levelled and ordered the 75m line pump for concrete. So glad I went for the slab over a timber floor construction as suggested.
Now looking to order materials, my next question comes with the roof construction. It will be a dual pitched roof spanning 4.8m. I want to insulate between the rafters so I get the full height inside, therefore I don't need any ceiling joists for a ceiling but is it still necessary to tie in the roof on every rafter or could I use 2 or 3 hefty ties (8x2's?) evenly spaced along the building to tie in the walls? I hope this makes sense. Any help is greatly appreciate!
P.s excuse the drawing
I'm not sure if anyone remembers but I came here to ask for advice on my workshop on a slope. I had the ground levelled and ordered the 75m line pump for concrete. So glad I went for the slab over a timber floor construction as suggested.
Now looking to order materials, my next question comes with the roof construction. It will be a dual pitched roof spanning 4.8m. I want to insulate between the rafters so I get the full height inside, therefore I don't need any ceiling joists for a ceiling but is it still necessary to tie in the roof on every rafter or could I use 2 or 3 hefty ties (8x2's?) evenly spaced along the building to tie in the walls? I hope this makes sense. Any help is greatly appreciate!
P.s excuse the drawing