Just musing. Not expecting a solution from you guys really. Carried 140 slabs in yesterday and I am knackered already. I've got, now on site, 300 limestone fossil rectangular slabs to lay indoors. Cleared the area and now I have a layout dilemma.
10m by 6 m space main with a side room as well. Down the centre of the whole building (ie more than this room) are a set of 5 brick clad steel posts that are beneath the roof apex. One at each end of the room to be tiled. These steels up with a laser and they deviate only 10mm from a straight line down the core of the building. They lead to double doors at one end that access the newer part of the house. I need to treat this as a datum point for tiling as the eye is drawn down this line.
Here's the problem: the wall to the left deviates by 290mm from this datum line, and also forms a bulge in the room but even so one end is 200mm wider than the other end of the room hence not remotely parallel to the datum line. This is the north wall and will be panelled to create substantial internal insulation.
The opposite wall is south and has a c.3m wide fire hearth and log burner chimney stack. (stupid design - chimney should be on opposite wall). This fireplace and hearth is twisted at an angle of 9 degrees off the datum line. Creates a 8cm tile run off versus the brick hearth over the width of the hearth.
As I need to tile lengthways down the room, the grout line will appear to run off at an angle on both sides of the room. Not sure what to do for the best. I think my only option is to alter the hearth on one wall and step the panelling on the north wall. The room was previously carpeted, so this odd skewed layout was largely hidden. It was a tithe barn so accurate setting out back in the day was not critical.
10m by 6 m space main with a side room as well. Down the centre of the whole building (ie more than this room) are a set of 5 brick clad steel posts that are beneath the roof apex. One at each end of the room to be tiled. These steels up with a laser and they deviate only 10mm from a straight line down the core of the building. They lead to double doors at one end that access the newer part of the house. I need to treat this as a datum point for tiling as the eye is drawn down this line.
Here's the problem: the wall to the left deviates by 290mm from this datum line, and also forms a bulge in the room but even so one end is 200mm wider than the other end of the room hence not remotely parallel to the datum line. This is the north wall and will be panelled to create substantial internal insulation.
The opposite wall is south and has a c.3m wide fire hearth and log burner chimney stack. (stupid design - chimney should be on opposite wall). This fireplace and hearth is twisted at an angle of 9 degrees off the datum line. Creates a 8cm tile run off versus the brick hearth over the width of the hearth.
As I need to tile lengthways down the room, the grout line will appear to run off at an angle on both sides of the room. Not sure what to do for the best. I think my only option is to alter the hearth on one wall and step the panelling on the north wall. The room was previously carpeted, so this odd skewed layout was largely hidden. It was a tithe barn so accurate setting out back in the day was not critical.