I’ve been pretty busy since my last mention of my new Workshop, I managed to find almost next door a supplier of secondhand insulation, it was about a quarter of the normal price and it allowed me to buy about 90 sheets of inch and a half Kingspan type stuff.
It was only after loading it I realise that I was itching and it had been up against fibreglass insulation at some point I hate that stuff and Pam is badly affected by it – lungwise, so it all has to be vacuumed, heyho.
Very few of the sheets had even a mark on them so pretty delighted.

Good news! I have been applying for my Green card which I got approval for the other day – yippee! Quite a process I can tell you. But just a fortnight too late for me to go back to the UK with Pam for a wedding, so I am here on my own– you’re not allowed to leave whilst applying for the card.
But this does mean that I have 2 1/2 weeks on my Jack Jones with which to get on with my Workshop. I have started pulling down the old ceiling which was just at the wrong height and not very good really at all. The weather has been extremely hot and humid and I can’t believe all I’ve managed to get done in two and a half days is get to this point.


Next I am fitting timbers to the L/H wall so that I have something to attach the Furring strips to- these are horizontal 1x3” strips which sit on top of all the insulation they do two jobs, holding the insulation to the wall and accepting the screws from the plasterboard etc.
It was only after loading it I realise that I was itching and it had been up against fibreglass insulation at some point I hate that stuff and Pam is badly affected by it – lungwise, so it all has to be vacuumed, heyho.
Very few of the sheets had even a mark on them so pretty delighted.

Good news! I have been applying for my Green card which I got approval for the other day – yippee! Quite a process I can tell you. But just a fortnight too late for me to go back to the UK with Pam for a wedding, so I am here on my own– you’re not allowed to leave whilst applying for the card.
But this does mean that I have 2 1/2 weeks on my Jack Jones with which to get on with my Workshop. I have started pulling down the old ceiling which was just at the wrong height and not very good really at all. The weather has been extremely hot and humid and I can’t believe all I’ve managed to get done in two and a half days is get to this point.


Next I am fitting timbers to the L/H wall so that I have something to attach the Furring strips to- these are horizontal 1x3” strips which sit on top of all the insulation they do two jobs, holding the insulation to the wall and accepting the screws from the plasterboard etc.
Last edited: