The road running by our gate is being planed and resurfaced over two days shortly. I was wondering about trying to get them to tip the planings on our drive and run their roller over them. For a cash consideration, obviously !.
Just wondering how viable this is from a practical standpoint? Can this stuff be rolled cold and give a reasonably finish?
Any ideas on how much to offer in spondoolicks ?
TIA
Just wondering how viable this is from a practical standpoint? Can this stuff be rolled cold and give a reasonably finish?
Any ideas on how much to offer in spondoolicks ?
TIA