• Hi all and welcome to TheWoodHaven2 brought into the 21st Century, kicking and screaming! We all have Alasdair to thank for the vast bulk of the heavy lifting to get us here, no more so than me because he's taken away a huge burden of responsibility from my shoulders and brought us to this new shiny home, with all your previous content (hopefully) still intact! Please peruse and feed back. There is still plenty to do, like changing the colour scheme, adding the banner graphic, tweaking the odd setting here and there so I have added a new thread in the 'Technical Issues, Bugs and Feature Requests' forum for you to add any issues you find, any missing settings or just anything you'd like to see added/removed from the feature set that Xenforo offers. We will get to everything over the coming weeks so please be patient, but add anything at all to the thread I mention above and we promise to get to them over the next few days/weeks/months. In the meantime, please enjoy!

Trimble Towers Workshop - Fitting out begins...

Looking good Mark.

Just a tip, get your flashing above the lower roof sorted out now, before you do any slating, otherwise you'll be leaning all over the slates (and risk breaking them) in trying to do it.
 
Evening all

Finally, despite it being Mother's Day and all that entails, I managed to find the time to do some work on site myself.

Anyone who's seen my other thread on my roofing lead challenge will know I wasn't happy with the proposal from my builder to use a cover flashing instead of soakers and step flashings on the abutment between the smaller roof section and the wall. Long story short, he's not here for a couple of weeks and after doing some obligatory Mum related stuff I decided seeing as the weather was a sunny and balmy 17 degrees that I would get on and give it a bash myself...

I took a lot of advice from friends and on here and despite some assurances that a cover flashing would be okay, past experience in our house across the road where one leaked badly and was replaced with soakers stayed with me so I'm going belt & braces...

Set up my tower to take a look then climbed up the battening on the rear roof and began removing slates to see how easy it would be to rip out a channel 2 slates wide to allow me to get the soakers in then head nail the slates back in.

Rather pleasingly the first couple at the top came out easy enough and before I knew it I was taking out the whole rake to do the job properly. It only took me just over an hour to pull off 34 slates and I only broke a single half slate which already seemed to have a weakness across the middle so well pleased with that.







I bought a slate ripper but didn't use it once! These bad boys which I haven't a clue where they came from but have had them in my toolbox for years came in very handy to work the nail head out then pincer them out. No nails lost and a single slate casualty, success in my book!



Take a moment to savour the view...



Just over an hour after starting here we are...





First soaker measured and fitted...



Then away we go...both sides and all edges given a wipe of patination oil for good luck...









And here's where I finished a couple of hours later. Light getting low and time to put kids to bed so I finished off with 3 soakers remaining, but Sod's law, only enough lead to make two more!!





Feeling thoroughly fulfilled now, and with a sore back!!

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
I had wanted to ask but never got around to it. I now understand what soakers are. The step flashings presumably will be cut into the brick work.
 
Andyp":1a7y1fov said:
I had wanted to ask but never got around to it. I now understand what soakers are. The step flashings presumably will be cut into the brick work.


I was going to ask my mate Google what soakers were.

The step flashings presumably then seal off the gap left by the soakers?
 
Hi both

Yep the step flashings then cut in and get sealed in with lead silicone. I could (maybe should) have raked out those joints with the slates off as Mike suggested but I wanted to get the soakers done to feel like I had achieved something, and plan to use the board of insulation lay on the top of the slates to spread the load when it comes to that.

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
What stops the rainwater running sideways along the top of the soaker underneath the tile and then onto the roofing membrane ?
 
RogerS":131nbh2z said:
What stops the rainwater running sideways along the top of the soaker underneath the tile and then onto the roofing membrane ?

Nothing I guess, but it's better than not having them there at all! The soakers are there to help with the water running down the wall and off the top of the slates against the wall and down the crack. All I know is, where we are is exposed and the previous house had a cover flashing which water blew under and made a mess in the room below, yet as soon as the roofer saw it and said it was wrong, replaced them with soakers, no more leaks…

Cheers
Mark
 
RogerS":3lxgzoxo said:
What stops the rainwater running sideways along the top of the soaker underneath the tile and then onto the roofing membrane ?

Morning all

I've only ever done my own roofing so I'm happy to be corrected by any professionals out there, but this is how I see it working. Not a easy thing to explain, so apologies for the brackets.

Any water that gets from the step flashing onto the soaker under a slate will fall towards the gutter. It is not likely to go sideways unless the soaker is fitted with a slope down away from the wall. When it reaches the bottom edge of the soaker, it falls onto the slating of the roof and then down into the gutter.

In the unlikely event that any water getting onto the horizontal part of the soaker (i.e. in the plane of the roof) does get across to the far (from the wall) edge of the soaker, it may drop into the gap (perpendicular to the ridge) between two slates. If it does, it drops onto the middle of the slate beneath it and gravity takes it down to the gutter, before it can reach the edges of the slate. The courses of eaves slates under the lowest full slate are there to maintain this feature.

Cheers

Dave
 
Very nice build and interesting info on leadwork. As a southern jessie relatively new to Scotland it took me a while to work out how the lead flashing works on Scottish slate roofs.



The side of the lead running below the slates is rolled upwards and back on itself towards the wall forming a channel, so any water finding it's way in runs straight to the gutter. When done properly it looks very neat and tidy but, as our local community centre has revealed, when an old roof starts to get tired and flexes downwards the water simply runs over the lead roll and into the building below. I think I prefer the southern method!
 
That last photo is a sort-of open secret gutter. It's a nice neat detail.
 
Mike G":29hqg5w7 said:
That last photo is a sort-of open secret gutter. It's a nice neat detail.

Ah - secret gutter. Not knowing what it was called that photo was the best I could find Mike but it's not the best example. The slates are usually much tighter to the wall or abutment. It does look tidy but I think I prefer the belt and braces of soakers and flashing.
 
Topsy turvy couple of weeks with work and builder availability but the past 5 days have started moving quickly.

My Polish fella's have a number of jobs on and as per our agreement (basically I spent so long di£&king around with which parts I was doing he had to take other jobs) the Gaffer was fitting mine in between. It was going to be another 4 weeks before he could come back and finish the roof so when another recommended roofer (coincidentally also Polish and also called Darius (Darek appears to be an alternative)) came to price up putting in a couple of Velux's into the kids bedroom ceilings I got him to price up finishing getting my lid on.

Price came in acceptable so I checking in with my guy to make sure he wouldn't have his nose put out of joint then went ahead.

He turned up on time last Friday to start the Velux work and after a bit of an issue with the flashing had finished these two in the day...

Tilly's room...










Barney's room...




Needless to say I was impressed and happy with his work and he cracked on with the workshop.

After two days of work split across 3 days, plus me painting the rafter feet (1 coat of aluminium primer, one coat of white primer then 2 topcoats, over 4 days due to 16 hours overpainting time) here's a few shots over the past few days and up to where we are at the end of today...





























And those bloody rafter feet that have taken me around 8 hours of painting time thus far, trying to ensure that they are cut in reasonably neatly and also the endgrain soaked as much as possible...



He's back to finish the leadwork, ridge, pointing of ridge and verges and gutters tomorrow so hopefully by this time tomorrow all major structural work will be done!

After that it's on me to insulate (and possibly but not yet decided whether I will) board the ceiling, joists for the small end 'loft' space, electrics (alarm, data, ring main and lighting) and painting.

Won't be long now folks...

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
Those velux windows can really make a difference. For weeks after having one fitted we kept walking past the bedroom thinking somone had left a light on. :)

Great progress on the workshop.
Won't be long now folks...
yeah right :D
 
Andyp":368sjhmh said:
Those velux windows can really make a difference. For weeks after having one fitted we kept walking past the bedroom thinking somone had left a light on. :)
Yep exactly what we've been doing! [emoji23]

Andyp":368sjhmh said:
Great progress on the workshop.
Won't be long now folks...
yeah right :D

Haha, I set that one up just for you, nice to see you didn't let me down! [emoji6][emoji23]

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
DaveL":1e7rz0bb said:
Good progress, you will need to sort out the door and the other windows next.

Windows will happen in a couple of weeks mate. Starting on the 19th we are having all the doors and windows in the house replaced with Aluminium (well actually Warmcore) and there are two windows in the kids' playroom that are still in great condition so the Workshop apertures have been sized to take those windows.

The doors I am designing now and will make myself in the 'shop. Need to get it alarmed first though which will come ASAP when me and my pal sort the electrics.

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
How are they going to access the ridge to put the ridge tiles on?

I'm sure everyone knows by now that I am a fan of Bedec water-based paints, and that I would have used Bedec Barn paint or Multi-Surface Paint for those rafter feet.......and never had to worry about repainting them. Every roof I build with exposed rafter feet I promise myself that I'll paint the feet before finishing the walls etc. Every time....... :lol:
 
Mike G":2o30bqq9 said:
How are they going to access the ridge to put the ridge tiles on?

Haven't a clue Mike, but he arrived at 07:30 so he is finishing the lead while his mate is currently pointing the verges so I imagine I'll find out about the ridge soon enough...

Mike G":2o30bqq9 said:
I'm sure everyone knows by now that I am a fan of Bedec water-based paints, and that I would have used Bedec Barn paint or Multi-Surface Paint for those rafter feet.......and never had to worry about repainting them. Every roof I build with exposed rafter feet I promise myself that I'll paint the feet before finishing the walls etc. Every time....... :lol:

Yep and I would have looked at that had I not already bought the Crown stuff that we had colour matched for the front gates, , also colour matched to our new windows, to do the rest of the woodwork in...

Not to worry, I'll call it my penance for having procrastinated for so long over so much of this build... [emoji23]

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
Damn and blast!!! I was hoping I was catching you up!!

Looking proper good!
 
Malc2098":ksqt19u6 said:
Damn and blast!!! I was hoping I was catching you up!!

Looking proper good!

Thanks Malc

I would have to do some serious procrastination from this point in for you to be catching me. I'd have to hand in my man credentials if I allowed that to happen!! [emoji23]

Hopefully they wrap up today then I will pull down all the scaffolds and clean up the site and we can get a proper look at how it will sit in the garden. I think it looks okay though and my mate reckons the notched out section helps to give it enough visual interest to make it look less imposing so I think it is okay.

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
Looking good - you'll soon have no excuse for not making stuff! [emoji3]

What are you going to do with the walls?

Did you need Building Regs for the Velux? When my daughter had them fitted during some alterations, they insisted they were accessible as fire escapes and they had to build steps to them.
In one bedroom they allowed a tiny door to be built to allow escape to the adjoining room.

Rod
 
Rod":2738eb80 said:
Looking good - you'll soon have no excuse for not making stuff! [emoji3]

What are you going to do with the walls?

Did you need Building Regs for the Velux? When my daughter had them fitted during some alterations, they insisted they were accessible as fire escapes and they had to build steps to them.
In one bedroom they allowed a tiny door to be built to allow escape to the adjoining room.

Rod

Cheers Rod

Oh the chances of me getting in there once it's built are as narrow as the odds on me having done it all myself by last Christmas, but that's a different battle...!

Re regs for the Velux's, I might have...erm...forgotten to mention it to anyone...

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
Rod":3p2glzxd said:
Looking good - you'll soon have no excuse for not making stuff! [emoji3]

What are you going to do with the walls?

Did you need Building Regs for the Velux? When my daughter had them fitted during some alterations, they insisted they were accessible as fire escapes and they had to build steps to them.
In one bedroom they allowed a tiny door to be built to allow escape to the adjoining room.

Rod

Every "habitable" room needs a (single)secondary means of escape to the outside, Rod. If there isn't a convenient external door, then a window is allocated that role. If it happens to be a window in the roof, then so be it, but it has to fall within all sorts of criteria to be considered an escape window. So it is the room which determines whether a rooflight becomes a means of escape, rather than all rooflights having to be means of escape. Your daughter's alterations are what necessitated using a rooflight for this purpose, and if the rooms she created or altered had an alternative means of escape then the rooflights wouldn't have had to take on this role.
 
Roofer arrived at 07:30 to crack on and by 3pm here we were...

I've tidied up the front facade a bit, the blue tarp hides the 'garden' electrical box because the weatherproof box has lost some of its weatherprooofedness...















I've got a little bit of pointing to finish between the undercloaking to fill in some small gaps and then the external physical work the building is done.

Plan is to dig some beds in front under the windows to grow something up the walls to soften them a bit and to lay the path around the front from the left to the bridge over the pond.

Windows should go in in about 3 weeks and my sparky mate will be round in between to help me sort the electrics and alarm out then I can move machines in.

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
Malc2098":38meewco said:
Drat, drat and double drat!!

Looks almost ready!!

Apart from windows and door, hooking up the down pipes to the drain and digging a channel between the house and shop to lay the conduits for the utilities the externals are done. Internally I need to insulate and board the ceiling, fit the joists for the small storage loft and paint the walls, it is close.

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
Mike what's the definition of habitable room. Are halls bathrooms kitchens and utility rooms habitable for the application of this?

Mark
 
Nice looking building Mark 8-) :eusa-clap:
Suppose you can't wait to get the inside finished and to occupy.



It will make a great cottage for the kids when they get older or the MIL :lol:
 
Hi all

Managed to get in the shop yesterday on day off wth the kids. They entertained themselves by making patterns in scrap with unused copper nails and I managed to crack on with getting the joists installed for my wood 'loft'.

Initially I was going to have them rest on the wall plate but this would have made the usable space too small so a bit of working out what suitable head height was required (the section below the loft is workbench area) and I came to a good height leaving me a good 8-10 inches of headroom using joist hangers.

Spent a while with an offcut getting the height right and fixing the first hanger on each side in the right place, plumb and without twist, then worked my way back at equal intervals to the back wall. Might bolt another to the front one to double up but other than that I'm really pleased with them.

I used a long level to make sure the bottom of each was level having already confirmed that all joist timbers were the same depth.

I bought a load of plugs and screws as my stocks are in the depths of the container but the guys on site fitting my new windows (separate thread coming) said not to be daft and gave me his impact driver and a load of 'concrete screws' which just screwed straight into the thermalite blocks without even needing a pilot hole which massively speeded the job up.

Each hanger now has 4 nails into the wall plate and a 3" screw each side directly into the block wall, and they are solid as a rock.

Start of the day...



Numero uno in place.



I then worked back down the left side getting all the hangers in place, then the right side, then measured and cut the timbers one by one working back to front. Pretty impressed with the builders accuracy as every one was 3375mm on the money to slide in with a snug fit to each side wall.



One of my little helpers.



Little helper making copper nail patterns...





No kids football this Saturday so my aim is to get the inside of the loft area roof insulated then the joists boarded out. Then I can start moving timber out of the container and into place.

Cheers
Mark


Sent from my iPhone using Tapatalk Pro
 
One thing I have learnt about little helpers is when they are keen they are not able and when they are able they are no longer keen. :D Always great to have them around though.

Keep up the progress.
 
My goodness, she's grown up! I saw her when her mum was carrying on her hip with one arm around her.......
 
Wow. She would have been 20 months old then and Barney 3 months old. She's eight and half now and Barney nearly 7.

Nearly time for you to do it again...

Mark


Sent from my iPhone using Tapatalk Pro
 
TrimTheKing":221b3npk said:
.........

Nearly time for you to do it again...

Mark

That statement could be so easily misconstrued :lol:
 
Back
Top