That meant belt sander across the grain, then with the grain, then torture boards:
Then on a nice dry warm day (ideal for epoxy work), I put 3 or 4 coats on the hatch, and a couple on the teardrop:
Unfortunately, the farmer decided that afternoon was a good day to plough up the dusty dry field, and we also suffered a cloud of little insects who decided that drying epoxy was a good place to land. Time to walk away and do something else.....
I had sent a cutting list to a Formica supplier, and went and collected all the various pieces. Contact adhesive has turned into something rare and expensive, for some reason.....but it's the only way to stick Formica down. You may recall that the kitchen worktop was an old hollow core door, for lightness. Well, it was soon to look a bit better:
I hate trimming bits! I hate routers.....
I'd even taken the precaution of taping up the front edge so as to give myself some peace of mind.
Time to walk away and find something else to do.......
I cut away some of the depth of a stainless steel vent, as it was deeper than the tongue box floor was thick. It's to vent the box as it's a gas store:
-
It's the easiest thing in the world in Autocad to offset a line and add a radius to the corners. You may recall this drawing from last year:

Note the line inside the edge of the teardrop, following it but with rounded bottom corners. That took 10 seconds to draw......and a week to build. Here's the process.
Firstly, a ripped up some 27mm oak boards:
Then careful re-sawing on the bandsaw, and planing on the P/T, and I ended up with a whole lot of 8mm thick stock:
Those boards were about 2.6m long, and I needed a couple of pieces 3.7m long. I wasn't sure whether to do the necessary scarfs before or after steaming them, and decided to do it before. I worked out that I could keep the join out of the steam box. I decided to just do half-lap scarfs. In 8mm thickness, it just seemed to be asking for trouble to try to do a tapered joint:
Sorry that's focussed on my shoes......
So, I'd got a couple of boards 3.7m long, and a bench around 2m long. I needed a round-over on both edges. I ended up lowering the table of my pillar drill until it could support the end of the boards, then roughing off the waste with a hand-plane, and then making a scratch-stock:
I made up a steam box, and some formwork:
This is what you're up against when steaming. Here's the springback when it came out of clamps the following day:
Right, that's it for today. More in the next few days.......