• Hi all and welcome to TheWoodHaven2 brought into the 21st Century, kicking and screaming! We all have Alasdair to thank for the vast bulk of the heavy lifting to get us here, no more so than me because he's taken away a huge burden of responsibility from my shoulders and brought us to this new shiny home, with all your previous content (hopefully) still intact! Please peruse and feed back. There is still plenty to do, like changing the colour scheme, adding the banner graphic, tweaking the odd setting here and there so I have added a new thread in the 'Technical Issues, Bugs and Feature Requests' forum for you to add any issues you find, any missing settings or just anything you'd like to see added/removed from the feature set that Xenforo offers. We will get to everything over the coming weeks so please be patient, but add anything at all to the thread I mention above and we promise to get to them over the next few days/weeks/months. In the meantime, please enjoy!

The Bike Workshop

Oo er. I can see a syphon might have to be employed if you've got any sort of grade.
 
I have a grade at the moment however it will be flat with a step up to the other side of the garden. Just need to dig out the higher ground and level off. I had started doing this but my No. 2 son wanted to learn how a digger works, so I set him to work over the weekend


Sent from my iPhone using Tapatalk
 
Well the good weather has allowed me to dig out most of the top soil down to solid ground. I have started thinking about hardcore to start filling it back in again.

I have a large amount of brick ends and broken slabs / crazy paving that were buried in the garden from a previous owner, would these and some recycled hardcore be suitable with Type 1 over the top to level it off prior to a sand layer

I have seen 6f2 recycled hardcore locally

John


Sent from my iPhone using Tapatalk
 
Well I’m ready to lay the hardcore base down, but have a quick question for you guys.

Do I install the shuttering and then put the hardcore and concrete in that or do I lay a hardcore base and then fix shuttering over that as per the photo

6d93b7d82136ad9c55412850f7e628a5.jpg


Oh decisions decisions


Sent from my iPhone using Tapatalk
 
Either/ or. I generally put the shutting in first because with hardcore down it's hard to whack posts in where you want.
 
Always prefer after so I can go round with my wacker plate without a care in the world ! knowing im not going to disturb any formwork when I lose concentration.
 
Thanks guys

Hardcore is being delivered next Tuesday so I’ve got the weekend to consider both options for the shuttering


Sent from my iPhone using Tapatalk
 
The hardcore is mostly in, first layer has been compacted ready for the next layer this week. Thoughts are moving onto the concrete now. I have been looking through the posts on here and the uk workshop and there seems to be some mention by MikeG regarding using steel reinforcing

My current soil is hard red clay with a layer maybe 1” of hard soil on top, on which I am laying the hardcore. Because of the clay, I read that I should have steel reinforcements placed towards the top of the concrete layer to counteract the movement of the clay

Any thoughts? The concrete I am going for will be circa 6” thick

Cheers

John


Sent from my iPhone using Tapatalk
 
Near the top if counteracting heave, near the bottom if expecting the ground to shrink. Frankly, the latter is more likely at the moment given how wet the winter has been.
 
Thanks Mike, as always you’re a star. Just got to work out how much I need. Am I correct in thinking that the metal needs a minimum of 50mm of concrete below and to the sides then?



Sent from my iPhone using Tapatalk
 
Looking at the steel reinforcement mesh online at the moment. Does anyone know if the mesh needs to cover the whole of the slab area or can it be 1/2m away from the edge and still work correctly?


Sent from my iPhone using Tapatalk
 
Thanks Rod. Think I’ve found some bigger mesh sheets that should fit nicely 3.6m x 2m should fit 4 sheets in with a little bit of jiggling about


Sent from my iPhone using Tapatalk
 
I found that Selco offered the cheapest A142 mesh around here, but they are trade only. Fortunately my day job involves designing the fire alarm systems for Selco branches, so while chatting to the guy behind the desk he told me anyone that has any involvement with the stores can have an account, Boom. Free delivery too, bonus.
 
A few photos of the last couple of weeks
fa461404485a9754365522dadb760e97.jpg

Hardcore delivery

01e345d0f90ac386686cd00db9c9f0b5.jpg

Having fun with the wacker

da2c0093a82c3fb19b510a8ef7a7c161.jpg

Sand down

2cb8758acc250963fb3ed91415ef0824.jpg

Shuttering down

88d601db08f9ace686dd9434e55956ac.jpg

DPM and A142 mesh in place


Sent from my iPhone using Tapatalk
 
And then for the big day. I didn’t sleep properly for a couple of days thinking about concrete slabs, but....

b3b8ac00449339bbac619a7b13101338.jpg

The pumping company were fantastic, talking through everything I needed to do and what he would do

411da158752eb4af9bad229853f5d6b1.jpg

The truck arrived 1 hour before the concrete truck to give him plenty of time to sort out the pipes

9106aa14f9b06b0150cf3e05210d3b11.jpg

Then the concrete arrives

No pics of in progress as it was so hard work keeping up with the speed the pump was supplying concrete at, but finally

4939e6037d8f1e4be86201ffa8946ab6.jpg

Levelled off

9dbde33d2690ab35c2f1fe197c58d584.jpg

Easy float was anything but

Time for a rest after that


Sent from my iPhone using Tapatalk
 
And up to date now

This was the work of my granddaughter, she wanted to help build the brick so I got her setting out the corners and then the first course.
5dce48959e4d83745cd9bdc0a3c5ba3b.jpg

Good job she wasn’t laying them as she said that she preferred to but the bricks together so there wasn’t a gap in between. Never mind about the mortar gap[emoji849]


Sent from my iPhone using Tapatalk
 
That's the hard stuff out of the way. The rest should be plain sailing. :eusa-clap:
 
Having watched 6 blokes and 1 mixer and 1 pump lorry lay 13 cubic meters of concrete I know how hard that would have been ;)

Looks good.
 
Mike G":1mnwzfek said:
That's the hard stuff out of the way. The rest should be plain sailing. :eusa-clap:

Yup, at this rate, he'll overtake Mark :lol:
 
RogerS":267jwz9k said:
........Yup, at this rate, he'll overtake Mark :lol:

So will this guy:

[youtube]Z22yFkyfYaE[/youtube]
 
I think Mark has actually finished his workshop but he is holding back the updates because he enjoys the attention so much.
 
Andyp":2lrqfel4 said:
I think Mark has actually finished his workshop but he is holding back the updates because he enjoys the attention so much.


[youtube]SazBzvQ0ZAM[/youtube]
 
TrimTheKing":3mwotowp said:
cadman_4":3mwotowp said:
Oh look what you’ve started now

Bullies they are John, bullies! :cry:

:eusa-whistle:

I wouldn’t stand for it, best go an tell teacher that they’re picking on you


Sent from my iPhone using Tapatalk
 
TrimTheKing":ll3p6fxu said:
They are the bl00dy teachers!! :lol:

Well in that case I hope you’ve got thick skin

I must keep up the progress now or they’ll start on me next


Sent from my iPhone using Tapatalk
 